Water
Water Systems
Operation and Maintenance of Potable Water Supply System
- All well transmission lines, distribution mains (350,000 lineal feet), service laterals and meter assemblies (199 active connections)
- 4 Water Tanks (2 million gallons storage), 5 Booster Stations, 2 Transfer Stations
- 22 Pressure Zones [28 Pressure Reducing Stations (56 valves)]
- 36 wells connected to potable system
- 5 primary water treatment facilities and several local treatment systems
- Supervisory Control and Data Acquisition (SCADA) network (remote monitoring and control system)
- Growth, maintenance, and security of SCADA network (software, hardware, programming, integration)
- 230+ fire hydrants
- GIS data collection, growing and maintaining accurate mapping of system assets
Operation and Maintenance of Irrigation Well Water Supply System
- Water storage & transfer, water loss management, and pond system maintenance
- Maintenance & repairs of 4 transfer pumps and motors
- Maintenance & repairs of SCADA equipment
- Supply lines connected only to the golf course irrigation pond system
- 29 active wells connected to golf irrigation system
Operation and Maintenance at Moore's Lake
- Responsible for Moore's Lake water right permit compliance
- Daily lake level, Garzas Creek flow data recording, and flow adjustments
- Operate and maintain siphons and sluice gate at dam
- 16-ring aeration system at Moore’s Lake
Residential Water Rates - Monthly
(Rates per 1000 gallons)
$2.04 1st 5000
$4.08 next 5000
$6.12 next 5000
$8.16 next 5000
$16.33 Thereafter
Construction Phase Water Rates - Monthly
(Rates per 1000 gallons)
$2.04 1st 5000
$4.08 next 5000
$6.12 next 5000
$8.16 Thereafter